25 Jun
2018
25 Jun
'18
5:20 a.m.
On 2018年06月22日 18:13, Liam Girdwood wrote:
On Fri, 2018-06-22 at 16:46 +0800, zhigangw wrote:
Liam
I want to estimate the CPU usage. How to estimate this with the verbose trace. Do you have any idea?
The pipeline work can be timed by looking at the pipeline schedule start and finish trace messages and the time delta between them.
e.g. consider a pipeline with a 1ms scheduling tick that takes 200uS to run from start to finish. The pipeline CPU utilisation is 20%
Liam
Hmm, this way would not take the scheduler period into account. And using the timestamp, I am not sure whether it is accurate than using the CCOUNT register. I will give another RFC later. please check it. Thanks ~Zhigang