7 Jul
2020
7 Jul
'20
9 a.m.
+ Tomasz,
It looks like the 'priority' parameter is used by the Low Latency scheduler in the algorithm of picking next task to run.
On Fri, Jul 3, 2020 at 5:37 AM Terry Lv terry.lv@nxp.com wrote:
Hi Experts,
I'm writing a topology with two pipelines and a mixer to mix them. I noticed there's a priority parameter in PIPELINE_PCM_ADD.
I've done some test on this parameter, i.e. use different or same priorities in two pipelines and check the result after mixer.
It seems that the result is not obvious.
Could you tell me the usage of the priority parameter do in PIPELINE_PCM_ADD?