
6 Apr
2018
6 Apr
'18
11:33 a.m.
On Thu, Apr 05, 2018 at 06:35:26PM -0500, Pierre-Louis Bossart wrote:
The structure of the code makes little sense here, it could be pre-bank-switch(); bank-switch(); post-band-switch(); in the same routine.
Okay let me restruture this part.
you need to add information that post-bank will need handled in a specific manner with multi-link streams.
Yes we already have that but not in the scope of this series
--
~Vinod